Project Overview

Address: Travelodge Kings Cross Royal Scot, 100 King’s Cross Rd, London WC1X 9DT

Project duration: 14 weeks

Project value: £3,200,000.00

50Rooms completed per week

40+Team size

Description & Scope

This fast-paced refurbishment saw us deliver a full fit-out across all 408 rooms, working to an ambitious schedule of 50 rooms per week. The project included:

• A brand-new Bar Café concept installation
• Reception area relocation
• Full internal decoration across bedrooms and communal spaces
• New carpets and vinyl flooring throughout
• Minor electrical works and bedroom furniture repairs
• Ironmongery upgrades
• Refurbishment of communal areas
• Bathroom upgrades including new vanity units, tiling, and sanitaryware

With live guests still occupying the hotel, it was essential that the refurb was delivered discreetly, efficiently, and with zero disruption to day-to-day operations.

Customer- First with IH Group

We specialise in ‘live-in’ hotel refurbishments – meaning properties like this stay open and trading while the work is carried out. No downtime, no lost revenue.
Our team is built on-demand and includes a range of tradesmen, site managers, and logistics personnel, who support the end-to-end project delivery.

Optimised for delivery, IH Group focuses on:

Phased delivery – one floor, or corridor section, at a time, allowing the rest of the hotel to function as normal

Discreet fitouts – our teams never use main guest entrances! IH Group works behind the scenes, with segregated zones that are both discreet and minimise noise

Dedicated indoor workspaces – no outside compound? No problem. IH Group plans accordingly, making use of available indoor areas for storage and logistics no matter how limited

Top-to-bottom refurb – whether it’s painting and repairs, right up to a full stripout and conversion, IH Group handles the works from start to finish

Materials management – the IH Group team directly procures around 80% of all building materials, ensuring consistency and a tight control of the schedule. Where relevant clients supply items that put the finishing touches on a project, such as soft furnishings or branded items

Project Gallery

Take a look at our project plans here

Trusted and Fully Certified

The IH Group is fully certified and compliant with industry standards, we’re:

• Fully insured
• Use well vetted teams
• Pre-qualification questionnaires
• Verification of all training and qualifications for all team members

You are in safe hands with IH Group