IH GROUP LOGO (white)
Double tree logo2

Double Tree by Hilton Kensington

PROJECTS

Project Overview

Address: Double Tree by Hilton Kensington, 100 Cromwell Rd, South

Project value: £1,150,000.00

160Bedrooms refurbished

Description & Scope

This conversion-focused project involved upgrades to the entire hotel including bedrooms and bathrooms at its Central London location, all within minimal space to work, with limited flexibility and on a programme dictated by room availability. The brief? Turn traditional bathrooms into modern shower spaces, refresh the bedrooms, and do it all quietly, cleanly, and most importantly, keeping disruption to an absolute minimum.

The scope included:

• Full bathroom conversions – replacing baths with large walk-in showers, plus sanitaryware upgrades including basins and taps

• Complete tiling in bathrooms to elevate finish and durability

• Minor electrical alterations in bedrooms and en-suites

• Full bedroom redecoration, including feature wall upgrades to align with updated branding

Despite the central London location and limited working access, our team managed deliveries, storage, and fit-out with precision, ensuring each room was back online without delay.

Customer- First with IH Group

We specialise in ‘live-in’ hotel refurbishments – meaning properties like this stay open and trading while the work is carried out. No downtime, no lost revenue.

Our team is built on-demand and includes a range of tradesmen, site managers, and logistics personnel, who support the end-to-end project delivery.

Optimised for delivery, IH Group focuses on:

For projects like this, IH Group takes an agile and discreet approach – no noisy works, no lorries blocking streets, and no interference with the guest experience.

IH Group manoeuvred for:

Smart scheduling – working around the rooms that could be released, with flexible team deployment to maximise output without pressure on the hotel

Low-profile operations – everything was routed through secondary access points; materials were stored, moved, and installed without touching public areas

Attention to detail – IH Group tidy as we go, leaving rooms guest-ready and minimising the need for follow-up visits or post-fit disruption

End-to-end project control – from strip-out to decoration, the entire programme was managed by our in-house to ensure high standards and continuity

Navigating the hustle and bustle with ease this project needed precision, patience, and professionalism – IH Group delivered on all fronts.

Project Gallery

Take a look at our project plans here

Trusted and Fully Certified

The IH Group is fully certified and compliant with industry standards, we’re:

• Fully insured
• Use well vetted teams
• Pre-qualification questionnaires
• Verification of all training and qualifications for all team members

You are in safe hands with IH Group
We’re ready to support you with your next project!