This compact but impactful project focused on a full redesign from scratch, refreshing and modernising 40 guest bedrooms at a busy service hotel – all while keeping disruption to an absolute minimum.
The scope included:
• A full strip out, to make way for the new brand concept
• Full decoration and bedroom furniture replacement
• New carpets and vinyl’s
• Electrical rewiring, air con installations, boarding and skimming
• Full bathroom tiling and new sanitaryware including bath to shower conversions
• Relocation of the reception and refurbishment of the communal areas to align
with the new brand
• Fireproofing works to protect against fire hazards and ensure guest safety
• Secondary glazing installation to reduce noise from outside
• Landscaping and improvements to the outdoor areas around a hotel to enhance appearance, access, and first impressions
• Small-scale repairs and adjustments to the building’s roof, without the need for a full roof replacement
Though small in scale, the turnaround needed to be fast and tidy – with minimal space to work in.
The IH Group team managed deliveries, storage, and fit-out through close project management, ensuring each room was back and available for bookings without
delay.
Additional work was added throughout the programme, however this did not prevent the team from delivering.
We’re proud to share this project was handed over on time, on the original handover date.
Doing what we do best! Working around the everyday running of hotels, big and small.
At Tibshelf, space was tight, access was limited, and every room needed to be back in service for handover date.
IH Group made it happen:
• Phased works with zero fuss – completely gutted, rebuilt and upgraded to the new brand design
• Low-noise approach – keeping noise and dust to a minimum for service guests
• Streamlined logistics – making the best use of indoor and outdoor spaces available to us, the IH Group team made smart use of storage spaces for tools, materials, and workflow
• Quick-turnarounds – from flooring to fittings, everything was installed with efficiency, keeping pace without cutting corners
• Aligned with design – working alongside the design team, IH Group collaborated to bring the vision to life, delivered through strong action
A lean but effective team was used to complete Tibshelf, made up of experienced tradespeople, a hands-on site manager, and just the right number of boots on the ground to get things done, and done well.
Take a look at our project plans here
The IH Group is fully certified and compliant with industry standards, we’re:
• Fully insured
• Use well vetted teams
• Pre-qualification questionnaires
• Verification of all training and qualifications for all team members
You are in safe hands with IH Group
We’re ready to support you with your next project!
If you are considering a fit-out or refurbishment project, it is essential to work with a reputable and experienced company to ensure that the job is completed to your satisfaction.
If you would like to hear more about our commercial refurbishment or fit-out service, contact IH Group today, we are ready to support you with your next project.
London Office:
167-169 Great Portland Street,
5th Floor, London, W1W 5PF
Midlands Office:
50 Cartmel Road, Daventry,
Northants, NN11 2PP
Areas We Cover: